A 60" Permalok connection
is made in 6 minutes or less, allowing a crew to install up to 10 pieces
of casing 20 feet long in one 8 hour
shift. |
|
The best field welders take
180 minutes to fit and butt weld one joint of 60" x .750" inch
casing. At that rate the same crew can install only 2-3 pieces of casing
20 feet long in an 8 hour shift. |