The Problem:
Install 2203 feet of pipe to increase the drinking water capacity
to Seattle. Tough topography requiring large diameter pipe and a
steep uphill angle, was a major concern; and the project required
pipe to cross the Snoqualmie River with an aqueduct extending approximately
25 miles to provide a larger quantity of drinking water for the
Seattle area.
The Solution:
Using Permalok Steel Casing, Northwest Boring Construction, Inc.
was able to use a 90" Soltau RVS 600 STS to install 2203
feet of 88" O. D. The cutting edge microtunneling technology
enabled the contractors to deal with the steep slopes and long
drives to complete what is believed to be a United States record
due to the volume of material excavated. The project won the
Trenchless Technology 2002 Project of the Year Award for New
Installation. |