The Problem:
Install a new 120" diameter culvert to replace a failing corrugated
pipe that carried an environmentally sensitive creek under a forest
service roadway 45 feet above in a remote location 13 miles inside
the forest. In addition, the creek was an active salmon spawning
area and the installation had to be accomplished during a specific
five-week window.
The Solution:
By using Permalok Steel Pipe, the contractor was able to install
the entire drive in only eight days and complete the installation
within a deviation of only 1/4" horizontally and 4-1/2" vertically – a
record for this size pipe.
The contractor estimated that it would have taken three to four
days to weld each section, as well as additional time to inspect
and repair each weld, making installation of the project in the
five-week window nearly impossible. |