Problem:
Installing a storm drainage system across a 600-foot distance,
beneath an existing rail yard of 32 rail lines. Friction was a
concern because of the long distance; and conditions were wet,
runny and sandy.
The Solution:
Miller the Driller used Permalok Steel Casing with a state-of-the-art
Akkerman TBM system for this challenging auger boring project.
Miller the Driller chose the Permalok interlocking pipe system
to overcome the wet, sandy conditions in the Union Pacific rail
yard.
Since friction was a concern across the long distance, Miller
the Driller used intermediate jacking stations to install the 72" O.D.
Permalok Steel Casing on line and grade. |