The Problem:
Install 4,300 feet of 16" steel casing for installation of an
HDPE liner pipe for a sanitary sewer ocean outfall. Limited lay down
area for pre-staging, rough seas for ocean support equipment, and
weld slag inside the casing impeding the installation of the HDPE
liner were major concerns.
The Solution:
Employing the Permalok HDD connection allowed the contractor to
install 40' sections of the casing from the drill rig side of
the operation, eliminating the need for ocean support vessels.
Smooth bore with no weld slag at the joints made installing the
HDPE liner easy. |