The Problem:
Install two tunnel runs 600 feet long and 1,200 feet long to access
raw drinking water from Standley Lake to serve a rapidly growing
Denver suburb. The steel pipe installed in the tunnels was to
be the actual carrier pipe and, as such, had to be capable of
handling internal pressure as well as withstanding high external
groundwater pressure.
The Solution:
Utilizing the Permalok Type 7 gasketed connectors, the contractor
was able to provide a pressure capable steel lined tunnel that
required no field welding or field repairs to the 50 mil Powercrete® external
coating. Welding each section to meet the requirements of
the job would have taken certified welders six to eight hours
per section, not including inspections and repairs, and would
have added at least 40 days to the completion date. |