Projects
  The Permalok Interlocking Pipe Joining System enables engineers and contractors to complete underground construction projects significantly faster than with traditional steel pipe. The most dramatic savings are experienced when Permalok casing or pressure pipe is used in the precise, labor-and equipment-intensive processes of pipe jacking and pipe ramming. A number of examples of Permalok's successful projects are listed below.
     
 

Microtunneling Projects

Microtunneling is a method of steerable remote control pipe jacking, and is considered the most precise pipe jacking method. It can cover the longest distances, and can handle variable ground conditions. Generally, microtunneling doesn't cause much subsidence compared to other pipe jacking methods.

  Project   Contractor
Tolt Pipeline Project   Northwest Boring
Beaver Water District Intake Expansion   Michels Pipeline Construction, Inc.
Los Angeles Harbor Project   Westcon Microtunneling, Inc.
Standley Lake Project   ASI/Michels Pipeline
West Side Combined Sewer Overflow   Impreglio / S A Healy JV
     
     
 

Pipe Jacking Projects

Pipe jacking utilizes a jacking device to push pipe horizontally into the ground, forming a continuous string of pipe. Material is excavated as the pipe is pushed in.

  Project   Contractor
Tampa Bay Water Project   E.J.M. Pipe Services, Inc.
Metra RR Crossing Project   Midwest Mole
     
     
 
 
 

Pipe Ramming Projects

Pipe ramming is a non-steerable method of forming a bore by driving a steel casing, usually open-ended, horizontally through the ground with a percussive hammer. The soil may be removed from an open-ended casing by augering, jetting or compressed air. In appropriate ground conditions, a closed casing may be used. Since the material is not excavated until after the pipe has been driven into place, there is little or no settlement of the surface roadway or railbed.

  Project   Contractor
Tampa Bay Water Project   Ballast Nedham
El Dorado RR Crossing Project   Middlecreek Mining
IDOT RR Crossing Project   Miller the Driller
Gold Beach, Oregon   Freeman Rock Enterprises/SCCI
     
 
     
 

Auger Boring Projects

Auger boring is a pipe jacking method of forming a bore by means of a rotating cutting head. The equipment may have limited steering capability, and auger boring is limited in the distance it can cover, but it is the most cost-effective method of pipe jacking.

  Project   Contractor
Springfield, VA Interchange Project   R.L. Ridgell Construction, Inc.
Milwaukee Rail Yard Project   Miller the Driller
Wichita Kansas Project   Augers Unlimited
     
 
     
 

Horizontal Directional Drilling Projects

Horizontal Directional Drilling (HDD) is a fast method of trenchless construction that uses guided drilling to permanently place pipe beneath both natural and man made barriers such as rivers, shores, roads and buildings.

 

  Project   Contractor
Port Hueneme Naval Base Project   Cherrington Corporation
Rockaway Beach Sanitary District Project   Cherrington Corporation
Twin Rocks Sanitary District Project   The HDD Company